Slatted timber media wall above oak cabinets in the ACS office

Case study · Interiors · Project management

ACS Solutions

A bare shell in Accra turned into a branded, joinery-rich workplace, delivered by one team in eleven weeks on site.

Client
ACS Solutions
Location
Accra, Ghana
Services
Interior design · Joinery · PM
On site
20 Jun – 05 Sep 2026
Status
Handed over

The brief

ACS needed more than furniture in a shell. They wanted a workplace their team and visitors would recognise as ACS the moment they walked in, and one partner to carry it from empty floor plate to handover.

  • What we did

    Space planning, interior design, bespoke joinery, lighting, flooring and brand integration, coordinated under one project lead.

  • How we ran it

    Regular site photography shared with the client, a single programme across trades, and joinery built to fit on site.

  • What they got

    A reception with a branded feature wall, learning and breakout zones, acoustic panelling, lit display niches and upholstered reading nooks.

Where we started

As wefound it.

Bare tiles, empty walls and builders’ stock on the floor. The ceiling services were in; everything the ACS team would actually use was still to come.

The empty reception as received, looking towards the timber entrance door and the stair
Entrance and stair, as received
The empty reception as received, looking towards the stair and the back offices
Stair and back offices, as received

Before and after

Drag the line.

The reception from the same corner, as we received it and at handover. The window wall took the ACS logo; the doorway became shelving; the stair got timber louvres beneath it.

The ACS reception as received: bare floor tiles, empty walls and builders’ stock on the floor
The same reception at handover: carpet, pendant lights, the ACS logo wall, shelving and timber louvres under the stair

From shell to handover

Eleven weeks,four moments.

  1. 20 Jun

    Bare shell with scaffolding and an open ceiling hatch

    Bare shell

    Scaffolding up, services exposed. Setting-out and measured survey.

  2. 18 Jul

    Joinery being assembled on protected floors

    Joinery arrives

    Units built to measure are assembled in place on protected floors.

  3. 10 Aug

    Finished reception with the ACS logo wall

    Handover

    Reception, offices and learning zones complete and branded.

  4. 05 Sep

    Upholstered reading nook beside a window

    Finishing touches

    Acoustic panels and upholstered nooks added after occupation.

Walk the floor

See it the wayACS sees it.

Newell Direct delivered our office fit-out on time and within budget. Their attention to detail and communication throughout the work gave us real confidence.

Director, ACS Solutions

Start a project

Got a site,a shell or abuilding?

Tell us what you’re planning. A project lead will come back to you with clear next steps, not a sales pitch.

Start a project
Visit
No 21 Awo Abla Avenue, Nanakrom-Adenta, Accra

From line to lifeA 45-second film about what we do